Sidetrack and recompletion risk evaluation — Waterflooded reservoir
Sidetrack or recompletion time (tR) is optimized for the pair of a production and injection well simultaneously under uncertainty with respect to expected monetary value (EMV) or risked net present value (NPV) as the objective function to properly understand and shed more light on the critical parameters influencing tR. The option to sidetrack or not is also evaluated. Analysis is aided by a...
Published at Journal of Petroleum Science and Engineering (Elsevier), 78(3-4):705-718.
Published in 2011
Oyinkepreye David Orodu, Zhonghua Tang, Paul A.L. Anawe
Orodu Oyinkepreye David » Oyinkepreye D. Orodu is a Professor of Petroleum Engineering and has varied Oil & Gas industry experience spanning field operations in pipeline integrity and academia. Preye holds a bachelor's degree in Chemical Engineering from the University of Port Harcourt; master's in Oil & Gas Engineering, the Robert Gordon University and a doctorate in Oil & Natural Gas Engineering, China University of... view full profile